Library Update
Greetings
District 6 Neighbors,
The big news
going into this council week is the opening of the second round of bids for the
new library. Bids were opened last Thursday, June 15, and reviewed by the
project team (made up of Mayor Woodford, Facilities Director Gazza and members
of his staff, Library Director Rortvedt and members of her staff, Finance
Director Ohman and members of her staff, City Attorney Behrens and legal staff,
plus team members from Friends of the Appleton Library, SOM and Boldt). Once it
was determined that the bids came in under budget, we had a special Finance
Committee meeting last night where we voted to recommend accepting the bids. We
needed a special meeting in order to get the item approved and on the agenda
for the full Common Council meeting tomorrow (6/21) as we had already voted to
cancel the July 5 meeting. The team would like to begin construction as soon as
possible to take advantage of as much good weather as possible before winter.
As we all
remember, global inflation, material and labor shortages caused the bids for
the original library design to be completely unfeasible. The team went back to
the drawing board and reworked the design in hopes of reducing the overall cost
of the project in order to stay within the committed budget. Skidmore, Owings &
Merrill, along with the Boldt Corporation, came up with a modified design that
reduced the overall square footage and eliminated some features (including, sadly,
the children’s garden) in hopes of getting bids that were within our project
budget.
A few
numbers:
City funds (borrowing and fund balance from prior year) |
$26.4 million |
ARPA funds (designated for broadband) |
$ 2.0 million |
Friend of the Appleton Public Library capital
campaign |
$12.0 million |
Total Project budget |
$40.4 million |
How the bids
came in:
BIDS |
|
Bids: |
|
Construction Contracts |
$24,848,957 |
Contingency |
$1,000,000 |
Geo-Thermal Allowance |
$1,200,000 |
Furniture, Technology and Signage |
$3,800,000 |
Construction Manager Fee |
$139,630 |
General Conditions |
$1,695,017 |
General Requirement |
$1,525,091 |
Bond |
$180,115 |
Insurances |
$353,884 |
Subtotal: |
$34,742,694 |
Professional Fees: |
|
Architectural Fees |
$4,167,451 |
SOM Reimbursables |
$105,000 |
Fund-Raising Campaign |
$450,000 |
Surveyor, LIDAR, Environmental, Commissioning,
Testing |
$347,765 |
Subtotal: |
$5,070,216 |
Temporary Library Costs |
|
Subtotal: |
$542,275 |
$40,355,185 |
The allowance
for Geothermal heating/cooling is due to bids not being received for that bid
package – the most likely contractor is actually working on the geothermal for Valley
Transit facility. Director Gazza believes the allowance to be a good number and
the team is confident that by reaching further than the original bids that we
will get a contractor for these wells. Geothermal is an important part of this
project, because, while more expensive initially, it provides huge operational
cost savings and is a greener solution to heating and cooling.
The architect’s
fee for Skidmore, Owings & Merrill increased from what we voted on in 2021
because it is based on the total project cost, which increased after adding the
ARPA funds and the Friends funds to the project budget. There was also some
additional cost for the redesign. We heard some comments that they didn’t think
the cost of the redesign was justified; that SOM had “overdesigned” and should
thus be responsible for any changes to lower the cost. I am not sure that
anyone who has tried to get a home project done in the last three years, or
even buy a vehicle or major appliance, could think that a firm could predict
the insane way that prices, labor shortages and supply chain problem would
affect things.
We also got
an update on the Friends of the Appleton Library fundraising campaign. There
have been a number of questions about project funding if the fundraising goal
is not met. In the fall of 2021, the Friends conducted a feasibility study for
the library. Quoting from the update “The study results indicated favorable
views of Appleton Public Library and Friends, a compelling case for support, positive
views of the design, and an understanding of the need to invest in the library
to serve the community now and in the future.”
Based on the
study, the Friends embarked on a $12 million fundraising campaign. They have
already secured $8 million in pledges in just the “quiet phase” of the
campaign. These pledges are from major donors who are approached before the
campaign expands to the public. They have a goal of raising 90% of the funding
before the public phase starts later this year – when regular folks can start writing
checks. The presentation gave me a lot of confidence that the goal would be
achieved.
The city
committed to $26.4 million in borrowing; however, with the $2 million in ARPA
funding, some funds remaining in last year’s budget, and the possibility of some
grants (we have already received a $140,000 energy grant that could be
allocated to the library), the total borrowing should be closer to $19 million.
It’s been a
long 15 years that our community has been talking about a new library and I am
truly happy that, assuming the bids are approved at tonight’s Common Council
meeting, we’ll see work beginning on this important center for our community.